FIXTURE / TEST DATA · Command-center snapshot 24 Aug 2026, 15:05 UTC. This view is not current Tony OS state. Live operating facts are served by the conversational console. Source: FIXTURE / TEST DATA. Dated command-center snapshot captured 24 Aug 2026 from live Tony O

What changed since I last looked?

What changed

The last verified GitHub inspection is 634bc585 after DEC-031. Notion executive registers picked up the 21 Aug meeting commitments. Full GitHub ↔ Notion reconciliation is still open.

Why this matters now
FACT
  • GITHUB SYNC — NOT FULLY RECONCILED. Last Reconciled SHA is blank. DEC-031 is synced; W1-08a remains an unresolved Class 3 presentation-layer divergence. Evidence Register object coverage is reconciled; field-level reconciliation is not certified.
  • DEC-031 is decided: Ramy Shahid is INTERIM APPR-CTO. That decision left Tony's action queue.
What changed
FACT
  • Approved Change Set: CHANGESET-2026-08-20-appr-cto-interim-designation on main.
  • New commitments from 21 Aug Infrastructure Collaboration and Tony × Doug: notes, questionnaire, consultant session, Peter compensation, transition clarification.
  • No new verified evidence. Evidence Verified remains 0 / 29.
  • No gate closed. W1-08a remains an unresolved Class 3 presentation-layer divergence.
What needs Tony
KNOWN COMMITMENT
  • Send Aybar proposed times for a Friday working session on testing mechanisms
  • Follow up with Peter the same day to ensure outstanding contributor compensation is addressed
Risks / conflicts
DERIVED FORECAST / RISK
  • Tony and Doug hold different understandings of the Peter transition arrangement's duration and structure.
  • Venue access claims contradict each other (DEC-025).
  • Three unresolved positions on the approved definition of v1 (DEC-023).
  • Engineering hours actually worked are disputed (DEC-024).
  • GitHub last inspected SHA 634bc585 is not fully reconciled to Notion; W1-08a remains a Class 3 presentation-layer divergence.
  • External survivability claims are contradicted by same-period internal statements (GATE-G05 / Guard List).
Recommended next moves
  1. 1Treat GitHub as technical canon until Last Reconciled SHA is set.
  2. 2Close the two overdue Tony-owed commitments that already have dates: Aybar session times (due 20 Aug) and Peter compensation follow-up (due 21 Aug).
  3. 3Ask Doug whether he spoke with Peter on the transition terms — that commitment is overdue and owed to Tony.

Sources

Back to command