FIXTURE / TEST DATA · Command-center snapshot 24 Aug 2026, 15:05 UTC. This view is not current Tony OS state. Live operating facts are served by the conversational console. Source: FIXTURE / TEST DATA. Dated command-center snapshot captured 24 Aug 2026 from live Tony O

What should I do next?

What to do next

Required action is the dated promises Tony already made. Everything else is optional or derived.

Required
KNOWN COMMITMENT
  • Message Aybar with Friday testing-session times (promised for 20 Aug).
  • Follow up with Peter on outstanding contributor compensation (promised 21 Aug, same-day wire cut-off).
Optional / derived
DERIVED FORECAST / RISK
  • Ask Doug for the Peter transition report-back. That promise is his, not yours.
  • Send Infrastructure Collaboration notes, collect Doug's questionnaire, and set the consultant session — all undated Tony-owed items.
  • Do not invent owners or booked dates for the eight actionable gates. No next-evidence action currently has a named owner.
Recommended next moves
  1. 1Close the two overdue Tony-owed commitments that already have dates: Aybar session times (due 20 Aug) and Peter compensation follow-up (due 21 Aug).
  2. 2Ask Doug whether he spoke with Peter on the transition terms — that commitment is overdue and owed to Tony.
  3. 3Do not treat empty Tony Actions as missing work. No Action record currently carries Tony Action Required.
  4. 4Do not close or advance any gate. Evidence Verified remains 0 / 29.

Sources

Back to command